ADVERTISEMENT

Tesla Plant Construction Can Resume as Water Blockade Lifts

Tesla Plant Construction Can Resume as Water Blockade Lifts

Construction at Tesla Inc.’s plant in Gruenheide, Brandenburg, can restart after the water was turned back on, German water provider Strausberg-Erkner told Germay’s Manager magazine.

Unpaid bills from the carmaker prompted the shut-off. The payment has been received and workers are on their way to lift the blockade, Sandra Ponesky, a spokeswoman of the Strausberg-Erkner water board, told the magazine.

©2020 Bloomberg L.P.